Automatic gas distribution station

3D modeling and visualization. Uralsk, Kazakhstan
Project including
According to the drawings, 3D modeling of each station node was performed, then 3D visualization of the automatic gas distribution station was performed. The station consists of the following nodes:
  • Block of automatic gas odorization;
  • Switching block;
  • Control room block;
  • Gas purification unit;
  • Coolant preparation unit
  • Block of the gas flow measurement system;
  • Condensate collection tank;
  • Gas heating unit;
  • Gas reduction unit.
Costumer
Topan LLP
(during my years in company)
Location
Uralsk, Kazakhstan
Project year
2016
Time elapsed
30 days
Kind of activity
Oil & gas
Breakdown